Yes, the official Atal Tunnel length in km is 9.02, so it is just over 9 km long. That figure comes from the Border Roads Organisation, the agency behind the project under the Rohtang Pass. At normal tunnel speeds, you’ll be through it in about 10 to 15 minutes.
The Atal Tunnel length in km matters less than what it means for your trip. The 9.02 km tube replaces the old climb over Rohtang Pass, which is why the Manali to Lahaul Valley drive is now possible for most of the year. You still have about 25 km of mountain road from Manali before you even reach the entrance.
Two things matter more than the distance itself. You can’t stop anywhere inside, and on busy days the queue on the approach road takes far longer than the tunnel. If you’re planning the full outing, our guide to driving through the Atal Tunnel on a Manali day trip walks through the timings.
Is the Atal Tunnel More Than 9 Km Long?
It is, but only just. The Atal Tunnel length in km is 9.02, which works out to 9,020 metres or about 5.6 miles. We checked this on 20 November 2026 against the Ministry of Defence factsheet published by PIB, and it matches the figure announced when the tunnel opened.
So when someone asks whether it’s longer than 9 km, the honest answer is yes, by 20 metres. That’s less than two city buses parked end to end, so you won’t notice the difference from the driver’s seat. What you will notice is how long nine kilometres feels with no window to the outside.
Why Some Sources Get the Atal Tunnel Length in Km Wrong
This is the part most people get wrong. When you see the Atal Tunnel length in km quoted as 9.2, that’s a rounding slip from some 2020 news reports, and older articles still carry the original planned figure of 8.8 km. The tunnel grew during construction, and the finished tube came out at 9.02 km.
The second mix-up is the record. This isn’t the longest road tunnel on Earth. It holds a narrower title, the world’s longest highway tunnel above 10,000 feet, certified by the World Book of Records (UK) in February 2022. If a page tells you it’s the longest tunnel anywhere, treat the rest of its facts with care too.
Where Are the Atal Tunnel Portal Locations?
Knowing the Atal Tunnel portal locations helps you picture the whole drive. The tunnel has two entrances, called portals, one on the Manali side and one in Lahaul. The stretch between them is the only part counted in the official Atal Tunnel length in km.
South Portal: The Manali Side
The South Portal sits about 25 km from Manali at an altitude of 3,060 metres, near Dhundi on the far side of the Beas. You reach it on the road through Palchan and up the Solang Nala, and this is where most queues form on weekends and holidays.
Here’s a small trick that generic guides skip. Reset your trip meter as you pass the south portal. It should show close to the official Atal Tunnel length in km by the time you see daylight again, and it gives kids and nervous passengers a simple countdown in the dark.
North Portal: Teling and Sissu
The North Portal opens near Teling village, close to Sissu in the Lahaul Valley, at 3,071 metres. That’s only 11 metres higher than the south end, so the drive inside feels almost flat even though you’re about 3,000 metres above sea level the whole way.
Come out on the north side and the scenery changes fast. Deodar forest gives way to bare, rocky slopes and the Chandra river. Many day-trippers stop at Sissu here, and our list of Sissu’s main sights for a Manali day trip helps you plan that stop well.
How the Atal Tunnel Length in Km Shapes Your Manali to Lahaul Valley Drive
Before the tunnel, reaching Lahaul meant crossing Rohtang Pass at 3,978 metres, a road that snow blocks for months each year. The tunnel runs under the range slightly west of the pass, so a single Atal Tunnel length in km now replaces hours of hairpin bends.
The savings are big. The Manali to Keylong road has dropped from about 116 km to 71 km, and the government says the Manali to Leh route is 46 km shorter and about 4 to 5 hours quicker. For Lahaul’s residents, it also ended the old pattern of being cut off for half the year.
How Long Does the Drive Take?
Plan on about 45 minutes from Manali to the south portal in light traffic, roughly 10 to 15 minutes inside, and around an hour from the north portal to Keylong, which is 37 km away. Those times stretch quickly on weekends, long holidays and snow days.
A simple Atal Tunnel route map makes the picture clear. You go from Manali to Palchan, up through Solang Nala to Dhundi, then through the tunnel to Teling and Sissu, and on towards Keylong. Heading east instead? Read our Chandratal road update first, because that route runs on a very different timetable.
The time saving is real, but it’s easy to overestimate. Even with a short Atal Tunnel length in km, the full return trip from Manali to Sissu can eat most of a day once you add queues, police checks and a meal stop. Budget for that rather than the bare driving time.
What Is It Like to Drive 9.02 Km Inside a Mountain?
It’s calmer than you’d expect. The tube is horseshoe shaped, 10.5 metres wide with an 8 metre roadway, one lane each way and an overhead clearance of 5.525 metres. Lighting is steady, and big trucks and army vehicles pass without fuss.
The surprise for first-timers is how long it feels with no view. For the entire Atal Tunnel length in km you see the same walls, lights and signs, so keep the music low, watch the speed boards and resist the urge to speed up as the road straightens.
Safety Features Along the Atal Tunnel Length in Km
This is where the tunnel earns its reputation. The government factsheet lists an emergency telephone every 150 metres, a fire hydrant every 60 metres, CCTV with automatic incident detection every 250 metres and air quality monitoring every kilometre.
There’s also a fireproof escape tunnel, 3.6 by 2.25 metres, built into the main tube itself. You’ll never see it as a driver, but it’s one reason we tell nervous travellers that this is a very closely watched stretch of road. Exit signs and evacuation lights run every 25 metres as well.
Rules and Timing That Matter More Than the Length
Here’s what we tell readers who fixate on the Atal Tunnel length in km: the 9 km is the easy part. After three accidents in its first few days in October 2020, the district administration banned unnecessary stopping, overspeeding, rash driving and overtaking inside, and police have since arrested tourists for stopping in the tube.
So we’d skip the selfie stop entirely. Orders issued in 2020 also banned photography within 200 metres of both portals, and a fine or a police case isn’t worth one blurry shot of tunnel lights. Take your pictures at Sissu instead, where the views are far better anyway.
When Should You Drive Through?
Timing changes the whole day. Leave Manali by 7 am, especially on weekends, because police often enforce a no-overtaking zone between Palchan and the south portal and the line can slow to a crawl by late morning.
In winter, aim to be back through the tunnel by early afternoon. Shaded stretches on both approaches can ice over once the sun drops, and fresh snow can shut the road with little warning. Our post on visiting the Atal Tunnel in December explains what changes in the cold months.
The Atal Tunnel length in km never changes, but access does. Check the latest advisory from the Kullu or Lahaul-Spiti district administration on the morning you travel, and see our update on whether Sissu is open right now before you set out.
Altitude: The Risk Nobody Mentions
Both portals sit above 3,000 metres, which is high enough for some people to feel the altitude, especially if they drove up from the plains the day before. A mild headache or shortness of breath on a walk around Sissu is common, and it usually eases once you head back down to Manali.
If you or a child gets a severe headache, vomiting, confusion or breathlessness at rest, don’t push on. Go back down and see a doctor at the nearest health centre straight away. We cover warning signs like these in our everyday health guides.
Who Built the Atal Tunnel, and How Long Did It Take?
The project was announced by Prime Minister Atal Bihari Vajpayee on 3 June 2000. Digging started in 2010, both ends met in October 2017, and the Rohtang Tunnel was renamed the Atal Tunnel in December 2019 to honour him.
The Border Roads Organisation ran the work with an Afcons and Strabag joint venture, at a cost of about ₹3,200 crore. One 587 metre section through a water-logged fault zone took about four years alone, which shows why the final Atal Tunnel length in km took a decade to complete.
Prime Minister Narendra Modi opened the tunnel on 3 October 2020. If you enjoy the engineering story, the Atal Tunnel page on Wikipedia has a fuller timeline of the delays and breakthroughs.
Is It Worth Driving the Tunnel Just for the Length?
Honestly, not on its own. Driving through a lit tube is interesting for about five minutes, and there’s nothing to see inside. The real payoff is what the Atal Tunnel length in km opens up: Sissu, Keylong and the Lahaul Valley within a single morning from Manali.
With half a day, we’d go through, spend an hour or two at Sissu and come back before the afternoon rush. With two days, stay a night in Lahaul and drive back early. Either way, browse more of our Himachal travel guides before you lock in the plan.
This guide is for general travel information. Road rules and access can change, so follow local police instructions and check official advisories before you drive.


